In this article I will certainly define the common basic demands of an audio, modern-day high pressure, straight installation. If you need information, then I recommend that you have an appearance at the internet site (). For anyone trying to find, contact your neighborhood pipes organisation. The following description associates with a modern high stress (400/600Kpa) system typically made by Kwikot South Africa.

geyser installationgeyser installation


Much less usual are old low stress systems (100kpa) open pipeline or "Latco" type systems. Realize that the components are NOT compatible in between both distinctive systems - High stress as well as Reduced stress! It is possible to eliminate an old reduced pressure system as well as change it with a contemporary high pressure system nonetheless - you get a new high stress hot spring and install it according to the present specification.



The hot spring sits in a tray made of plastic (often red) or tin plate. I prefer the plastic ones.

Considering that June 2001, the drip tray is not optional - its obtained to be there as well as there has to be a drain pipeline for it! The drainpipe is a 50mm PVC waste pipe that drains pipes the tray by piping the water out the house (geyser installation).

The 2-Minute Rule for Geyser Installation

The following most obvious attribute would certainly be the. These are little brass components installed at the end of a 30cm length of pipe. Both vacuum breakers stand up and down about 30cm above the geyser. These are vital, as they stop water siphoning out the geyser when the cool supply is quit.

Bear in mind that vacuum cleaner breakers are a reasonably brand-new need - there are still thousands of old HP systems out there without vacuum breakers and also I am yet to see one collapse. Just since I have not seen it doesn't imply it's not taking place!

The cold water side is the side that directly connects to the drainpipe dick as well as goes into the hot spring near the bottom. After the turned off valve you would usually discover a Stress Control Valve (PCV). There are a number of different types, primarily made from brass yet some are constructed from plastic.

This is where the PCV launches pressure as well as this is the pipe that often leaks. Do not worry if you can not locate the PCV alongside the geyser - it may be placed up to 10 metres away, typically in a much more easily accessible put on a wall surface outside. Often it's in a little plastic box outside.

Not known Details About Geyser Installation

This is a crucial element that needs to never be messed with or 'repaired'. This shutoff should have a steel (copper or steel) pipe attached to it and the pipeline have to lead directly out the structure. This vent pipeline is a crucial security feature of the entire system. It needs to be made of copper or steel - plastic.

The T&P shutoff is the least optional element - visit here it needs to exist! - The weight of the geyser need to be properly sustained on the roofing system trusses - a minimum of two supports under the 'feet' of the geyser. If it looks unstable get a plumber to inspect it out.

This was not a demand on old hot springs, but it is now as well as it's worth suitable one. The geyser has to be earthed! I have seen lots of hot springs with the earth cord unconnected. All the copper pipes should likewise be earthed as well as adhered to the geyser planet. This is not an insignificant safety measure! Obtain a qualified electrical contractor to check your installment if the bonding is missing or looks dodgy.


Once more, these are frequently simply left existing next to the hot spring. There are basically only two main thermostat types - the modern-day round "Kwiktherm" in more recent Kwikot hot springs and also the VK (rectangle-shaped block) type in older geysers and also original site in some more recent non-Kwikot devices. The hot spring might be fed (cool water) with polcop (plastic) pipe - approximately the shut off shutoff, but the pipe right into and out of the hot spring need to be copper or galvanized steel.

The Best Guide To Geyser Installation

geyser installationgeyser installation


The hot water side must be copper, steel or accordingly ranked (70) plastic or composite pipeline. Keep in mind that you must contend the very least 1m of copper/steel pipeline out the geyser - you might not attach plastic (compound) pipeline directly to the hot spring. As above, the PCV and also T&P must be constructed from copper or steel - specifically hop over to here the air vent out of the T&P valve.

geyser installationgeyser installation


I have seen a variety of setups where the installer has just run a brief size of 22mm copper into the drip tray with the idea being that the T&P can air vent straight into the drip tray. An idea due to the fact that the hot (100 +) water/steam melts the drip tray and also the PVC drainpipe pipe.

The PCV is normally above the geyser as well as the cold water moves down right into the geyser. This is rather crucial due to the fact that it develops an anti-syphon loop that avoids the hot spring from draining back through the inlet in the occasion of a water supply failing. If you fume water appearing your chilly taps when the water fails after that this is not working appropriately.